The Confirmation Of The Spare Parts Carried In EPC Contract

The EPC project includes the design and purchasing. When signing the EPC contract, the EPC companies only give the description of the project function. The exact scope of purchasing and specifications could not be showed in contract, which puts hidden danger in the future.
As the general contractor, he should protect himself through exact terms in contract. The problem easily neglected is spare parts carried in EPC contract. Because the spare parts could not be confirmed when signing the contract, some owners put forward part lists and quantity according to reference project. However, the general contractor would find that the equipment confirmed by bidding will be different from EPC contents. There will be the following several situations. The spare parts required by owner is not suitable for actual equipment. The spare parts matching with equipment are not listed in the contract. The quantity of spare parts listed in contract are different from the actual demands. What's worse, some general contractors signed the contract with the owners without confirming the quantity and models. They think the spare parts supplied could meet the demands of the owner, while the customer could not be satisfied with the quantity of spare parts supplied by contractor. So the negotiation between them starts. The general contractor could solve this problem through the contract showing that the spare parts could be supplied for free during the guarantee period not listing the specified spare parts and related quantity. It is very common in the supply of materials handling equipment including stacker reclaimer, belt conveyor, screw conveyor, pipe conveyor, apron feeder, crushing machine and etc.

评论

此博客中的热门博文

The Comparison of Portal Scraper Reclaimer and Boom Scraper Reclaimer

The Analysis Of Advantages And Disadvantages On Boom And Portal Bucket Wheel Stacker Reclaimer

The Features Of Different Apron Feeder